PROGRAMME | |
DAY ONE (20 October 2020) |
08:30 | Registratione |
09:00 | Introduction |
09:15 | Vietnam’s MRT and North-South High-Speed Rail (HSR) project: Project schedules and next steps for collaboration |
10:00 | Morning Refreshments |
10:15 | Standards and technical regulations system of urban railway in Vietnam |
11:00 | Update on the preferred route and alignment of Vietnam’s North-South HSR, including development plans for stations and station area planning for all station in north and south priority sections |
11:45 | Current status on Vietnam’s HCMC and Hanoi MRT system projects, and blueprint for the development of proposed Danang MRT system projects: Challenges in keeping the projects on track |
12:30 | Lunch |
14:00 | Reviewing the environment impact assessment in the construction of MRT and HSR tunnel route |
14:45 | Geospatial tools to create geospatial deliverables and design topographic survey to capture lengthy MRT and HSR corridor |
15:30 | Afternoon Refreshments |
15:45 | Under sleeper pads to provide the resiliency between the sleepers and ballast |
16:30 | Panel Discussion |
17:00 | End of Day 1 |
DAY TWO (21 October 2020) |
09:00 | Introduction |
09:15 | Latest trends, technologies and innovation for the railway sector to ensure a smooth and trouble-free operation and keeping the system up and running |
10:00 | Morning Refreshments |
10:15 | The most efficient and cost effective fire protection for MRT and HSR stations and rolling stock |
11:00 | New test method for safety against derailing |
11:45 | Design and planning of MRT and HSR tunnel ventilation systems, aerodynamics and thermodynamics of tunnels |
12:30 | Lunch |
14:00 | Current development in project financing options for MRT and HSR infrastructure construction |
14:45 | Design and construction aspects of precast segmental bridge decks for rail viaducts - the challenge to choose the right structural |
15:30 | Afternoon Refreshments |
15:45 | Geotechnical exploration to understand and manage the ground risk associated during the construction phase of the proposed MRT and HSR projects |
16:30 | Concluding panel discussion |
17:00 | End of Conference |
|
|